August 2007
There is a significant increasing
trend in 08A Electrical Shock ORPS across the DOE Complex. August
2007 was above the Upper Control Limit with 6 reports, June 2007
was two standard deviations above average with 5 reports. In the
past three months, there have been a total of 15 Occurrence
Reports with a 08A Keyword. In comparison, there were only 5 in
the previous three months.
The 15 reports of interest are:
|
Serial
Number |
Categorization Date |
|
NE-ID--BEA-ATR-2007-0012 |
6/6/07 |
|
NA--LASO-LANL-FIRNGHELAB-2007-0001 |
6/11/07 |
|
NA--LASO-LANL-BOP-2007-0012 |
6/12/07 |
|
SC--BSO-LBL-EETD-2007-0001 |
6/22/07 |
|
NA--LASO-LANL-TA55-2007-0022 |
6/29/07 |
|
NA--NVSO-NST-NLV-2007-0003 |
7/11/07 |
|
NE-ID--BEA-CFA-2007-0002 |
7/14/07 |
|
NA--LASO-LANL-BOP-2007-0013 |
7/17/07 |
|
EM-SR--WSRC-FSSBU-2007-0003 |
7/26/07 |
|
SC--ASO-ANLE-ANLEAPS-2007-0003 |
8/7/07 |
|
SC--BSO-LBL-EHS-2007-0005 |
8/8/07 |
|
NA--KCSO-AS-KCP-2007-0008 |
8/13/07 |
|
NA--LSO-LLNL-LLNL-2007-0038 |
8/14/07 |
|
SC--SSO-SU-SLAC-2007-0009 |
8/22/07 |
|
EM-RL--PHMC-TPLANT-2007-0004 |
8/23/07 |
The Office of Science (SC prefix)
08A chart shows August 2007 above its Upper Control Limit with 3
reports in August.
The decrease from 15 reports per
month to 10 per month on the All DOE All Electrical Events chart
appears to be going away. The current data are not yet a
significant increase from the 10 per month baseline, but the data
appear to be very close to a significant increase, and are
hovering about the old rate of 15 per month.
Electrical
Events ORPS by Month All DOE
08A Electrical Shocks
ORPS by Month All DOE
08J Electrical Near
Miss ORPS by Month All DOE
08J Electrical Near Miss
- Top 7 Causes, All DOE
Electrical Events ORPS by Month SC Program Office
08J Electrical
Near Miss ORPS by Month SC Program Office
08A Electrical
Shocks ORPS by Month at SC Program Office
Electrical Events ORPS by Month NA Program Office
08A Electrical
Shocks ORPS by Month at NA Program Office
08J Electrical
Near Miss ORPS by Month NA Program Office
Electrical Events ORPS by Month EM Program Office
08A Electrical
Shocks ORPS by Month at EM Program Office
08J Electrical
Near Miss ORPS by Month EM Program Office
For more information on Statistical Process
Control, please see
http://www.hanford.gov/rl/?page=1144&parent=169
or contact Steve Prevette at Fluor Hanford at
steven_s_prevette@rl.gov
|