DOE Complex Electrical Event Charts
March 2009
04/11/09
Analysis of EFCOG Electrical Safety Charts for
March 2009
SC Program Office did achieve a decreasing trend
(greater than 10 of 11 months below average) for 08J Electrical
Near Miss. However, December came in with two reports in the
same month and January 2009 a further report. A decision to
baseline the chart to a zero rate is being deferred until more
data are available.
NA Program Office charts are stable.
EM Program Office Electrical Shocks (08A) has had
a new, increased baseline average added to the chart due to the
increasing trend noted last month.
All other charts are stable on their current
baselines.
There are now four cause codes tied for first
place on the 12 month cause chart, although each account for
only three events each.
Raw Data Sheet
Electrical Events ORPS by
Month All DOE
08A Electrical Shocks ORPS by
Month All DOE
08J Electrical Near Miss ORPS by
Month All DOE
08J Electrical Near Miss - Top 7
Causes, All DOE
Electrical Events
ORPS by Month SC Program Office
08A Electrical Shocks ORPS by
Month at SC Program Office
08J Electrical Near Miss ORPS
by Month SC Program Office
Electrical Events ORPS
by Month NA Program Office
08A Electrical Shocks ORPS by
Month at NA Program Office
08J Electrical Near Miss ORPS
by Month NA Program Office
Electrical Events ORPS
by Month EM Program Office
08A Electrical Shocks ORPS by
Month at EM Program Office
08J Electrical Near Miss ORPS
by Month EM Program Office
For more information on Statistical Process
Control, please see
http://www.hanford.gov/rl/?page=1144&parent=169
or contact Steve
Prevette at Fluor Hanford.
|