There was an overall increase for all Electrical Events across the DOE complex for January.  January was above the Upper Control Limit with 10 reports, the highest number since January 2006.  The reports of interest are listed in the data file accompanying the charts.

There was an increase for 08A Electrical Shocks across the DOE complex for January.  January came in above the Upper Control Limit with six reports.  There had been previous spikes in June and August 2007, but the September - December data had returned to the baseline average of 1.8 per month.  The specific reports involved were:

EM-RL--PHMC-WESF-2008-0001

EM-RL--WCH-ERDF-2008-0001

EM-SR--WSRC-WVIT-2008-0002

NA--LSO-LLNL-LLNL-2008-0001

NA--LSO-LLNL-LLNL-2008-0004

NA--SS-SNL-NMFAC-2008-0002

EM spiked above its Upper Control Limit for 08A Electrical Shocks with three reports.  This was the highest monthly number since June 2005.

EM spiked above its Upper Control Limit for 08J Electrical Shocks with four reports.  This was the highest monthly number since February 2006, nearly two years ago.

The DOE Complex-wide 08J Electrical Near Miss chart shows a decreasing trend for May 2007 - December 2007.  There have been 2 or 3 events per month during that time interval, all below the baseline of 3.6 per month.  January 2008 did come in above the baseline, but next month a new, reduced baseline average should be able to be established.

“Check of Work Less than Adequate A3B1C01” remains the leading cause of electrical events.

Raw Data Sheet

Electrical Events ORPS by Month All DOE

08A Electrical Shocks ORPS by Month All DOE

08J Electrical Near Miss ORPS by Month All DOE

08J Electrical Near Miss - Top 7 Causes, All DOE

Electrical Events ORPS by Month SC Program Office

08A Electrical Shocks ORPS by Month at SC Program Office

08J Electrical Near Miss ORPS by Month SC Program Office

Electrical Events ORPS by Month NA Program Office

08A Electrical Shocks ORPS by Month at NA Program Office

08J Electrical Near Miss ORPS by Month NA Program Office

Electrical Events ORPS by Month EM Program Office

08A Electrical Shocks ORPS by Month at EM Program Office

08J Electrical Near Miss ORPS by Month EM Program Office

 


For more information on Statistical Process Control, please see http://www.hanford.gov/rl/?page=1144&parent=169 or contact Steve Prevette at Fluor Hanford at steven_s_prevette@rl.gov

 


EFCOG POC

DOE POC

Lloyd Gordon, LANL - Chair

Division Electrical Safety Officer

LANS, Ltd.
Box 1663, MS H814
Los Alamos, NM, 87544

Phone: 505-667-0778

E-mail:lbgordon@lanl.gov

 

Mark Mcnellis, SNL -Vice Chair

Electrical Safety Engineer

Sandia National Laboratories
Po Box 5800
Albuquerque, NM  87185-1094

Phone: 505-507-8195  

E-mail: msmcnel@sandia.gov


Jackie McAlhaney, WSRS - Secretary

Technical Advisor

Washington Savannah River Company
Building 703-H 
Aiken, SC 29808

Phone: 803-208-3389 

E-mail: jackie.mcalhaney@srs.gov

 

Frank Russo, DOE-HQ/NNSA
NNSA/DOE
1000 Independence Ave
Washington, DC   20585

Phone: 202-586-9056

E-mail: frank.russo@nnsa.doe.gov