Document Library
General Work Management
-
NSTec Integrated
Work Control
Manual -
12/13/07
-
Job Hazard Analysis Excellence Document
- Updated
06/22/07
-
An Analysis of DOE Work Control Programs - An ISM Perspective: The Department of Energy’s (DOE) Integrated Safety Management System (ISMS) is being
implemented at the field activity level. In that DOE operating contractors accomplish work through work control processes, it is beneficial to be aware of those ways field sites are effectively implementing ISMS core functions and principles through their work control
processes; and then, of equal importance, to promulgate notable practices to the DOE complex.
-
Rocky Flats Integrated Work Control Program, Revision 3: This revision #3 of Rocky Flats work control procedure has eliminated check lists and tables,
placing responsibility to identify hazards and incorporate controls into the work package on subject matter experts and the manager responsible for approving the work package.
-
Savannah River Site Work Control Procedure: The scope of this Savannah River Site Work Control procedure includes implementation of
approved modifications, fabrications, projects, and maintenance (preventive, predictive, and corrective) activities performed by maintenance, construction and vendor/subcontract personnel, that impact facilities, buildings, systems, equipment, components and operations at the
Savannah River Site (SRS).
-
LANL Integrated Work Management (IWM) process: IWM defines requirements and a process for doing work in a safe, secure, environmentally
responsible manner. The IMP includes templates and forms.
-
-
Lawrence Livermore National Laboratory's
Maintenance Management System:
Work Management System Adopted by the Plant Engineering Department (PE) to manage and conduct maintenance activities on the facilities and infrastructure at LLNL.
-
Hanford's Work Management Procedure:
This procedure details the work management process for initiating, authorizing,
performing, and conducting field (physical) work on Fluor Hanford (FH) physical assets within FH facilities and projects.
-
Hanford's Tank Farm Contractor Work Control Procedure: The Tank Farm Contractor Work Control procedure defines work management from initiation of a work
request through work order closeout. It specifies when formally written work instructions are required; and it specifies the degree of planning required. This procedure uses a graded approach to implement requirements and to provide the level of discipline required to maintain
safe operation of the facility.
This procedure applies to corrective maintenance, preventive maintenance, troubleshooting, modification, fabrication, select operational activities, and certain construction on structures, systems, and components at tank farms.
- Updated 12/10/07
- PRT
User Guide: Standardized management reporting and
performance indicators through an end user desktop
reporting tool.
ISM
- DNFSB 2004-1: Safety Management of Complex High Hazard Organizations:
This report synthesizes suggestions for provoking innovations and new solutions that should satisfy the Board’s Recommendation 2004-1 and can help DOE improve the safe management of nuclear programs.
- ISM Team Leaders Handbook: The handbook provides recommended training, experience, and skills that are important components to ensure that individual team
members are prepared to effectively participate in the verification. The handbook also provides useful information for those individuals who are preparing for a verification.
- Activity-Level Worker Protection at Defense Nuclear Facilities: This draft DNFSB report complements
DNFSB/TECH-16 and DNFSB/TECH-20, Protection of Collocated Workers at the Department of Energy’s Defense Nuclear Facilities and Sites, by providing practical lessons learned regarding the attributes commonly associated with a strong, effective worker protection program, as well
as suggesting methods for measuring the effectiveness of activity-level worker protection programs.
- NNSA Work Planning Assessment question: Questions that Should Be Considered when
Conducting Assessments of the Effectiveness of Incorporation of ISM Core Functions into Activity Level Work Planning and Control at NNSA Sites.
- Rocky Flats ISM System Description: This Manual identifies the requirements for using the ISMS in the planning and execution of work. It also provides information to
demonstrate that the Site follows DOE requirements and guidance for implementation of DNFSB Recommendation 95-2. This Manual is also used to explain and demonstrate the Site approach to safety management, environmental management, work planning, and worker, public and
environmental protection to interested stakeholders.
- ISM/EWP Survey Tool: This file gives you a step-by-step process for conducting a survey on the ISM five core functions and seven guiding principles. Over 100
survey questions are included. Data collection spread sheets and a process control chart with instructions is included.
EWP
- Fernald Enhanced Work Planning Implementation plan: EWP is a process that evaluates and improves the program by which work is identified,
planned, approved, controlled and executed. EWP focuses on the prevention of worker
accidents through the early identification and control of hazards.
Work Control Tools & Processes
- Fernald Work Request, Order Procedure: This Fernald work control procedure establishes responsibilities for various personnel, defines expectations for
safety, and describes work control processes associated with work requests/work orders. It discusses approving, controlling, and managing maintenance work activities performed by Maintenance Department personnel in the Site Operations and Maintenance (SOM) Division at the
Fernald Environmental Management Project (FEMP).
- Rocky Flats Lockout and Tagout Procedure: This is an excerpt of the Rocky Flats Occupation Safety and Health Program Manual, Chapter 9, which is the site's program for
Lockout/Tagout. The procedure includes instructions for single isolation when doing minor maintenance and preventive maintenance work.
- Los Alamos' Work Provider Work Control process: This administrative procedure (AP) establishes the work control process that implements the
requirements of IMP 300-00-00.0.
- Integrated Work Management for Work Activities, into associated KSL maintenance and construction activities. IMP 300-00-00.0 (hereafter referred to as “IMP 300”) defines the LANL Integrated Work
Management (IWM) process. IWM is the method for doing work in a safe, secure, environmentally responsible manner.
- Los Alamo's Work Planner Desk Instruction Guide: This desk instruction reflects the requirements stated in
LIR IMP300-00-00, “Integrated Work Management for Work Activities,” as they relate to the KSL internal work planning processes, and is intended for use as a guide to planners involved in the process. Automated CMMS internal processes are referenced rather than restated.
- Los Alamos's Pre-job Briefing Check List
- Los Alamo's Work Planner Work Package Review Checklist
- Los Alamos' Skill of the Craft list: This
list is an example of activities and it is not to be considered all-inclusive or exclusive. The site hazards and conditions may remove these types of activities from the Low Hazard non-IWD category. The activities are routinely (more frequent than 1/yr) performed, have
routinely accepted hazards and engineered controls have been established, thoroughly reviewed and have proven highly reliable in minimizing risks.
- Los Alamo's Work Identification form
- Hanford's Qualification Card and Guide for Maintenance Person in Charge: The Qualification Card and Guide for Maintenance Person in Charge (PIC)
requires the Field Work Supervisor candidate to become knowledgeable in the procedures that are used to execute work safely in the Tank Farms and demonstrate that knowledge to the satisfaction of various Subject Matter Experts. The Qualification Card includes documented
performance of the candidate supervising work in a radiation area while being observed by an experienced qualified PIC/Field Work Supervisor or his Manager.
Reporting / Performance Indicators
- ISM Survey Tool: This file gives you a step-by-step process for conducting a survey on the ISM five core functions and seven guiding principles. Over 100
survey questions are included. Data collection spread sheets and a process control chart with instructions is included.
- Richland's Statistical Process Control Process:
Statistical Process Control is playing a safety and quality role at the Richland site.
This articles provides insights into how to establish and use statistical process controls to measure the effectiveness of a sites ISM/Work Control processes.
- SRS
Program Reporting Tool (PRT): This end user desktop
reporting tool provides "real time" Work Management
information to the end user's desktop computer. The
program delivers a broad spectrum of reporting,
including Performance indicators specific to all levels
of Work Management business. A special features of the
program is that it autogenerates standardized Work Week
Critique reporting, specific to each of the Site's
Projects and Facilities.

|